Post-plant Conversion
PP%VALv0.1.0 · experimental · validated 2026-07-16What it measures
Once the spike is down, how often the round converts to a win.
Formal definition
Rounds won after a plant ÷ rounds with a plant (attack side).
Inputs
- spike plant events
- round results
Exclusions
None beyond the standard confidence floor.
Sample & population
- Minimum sample
- 25 plant rounds
- Baseline population
- Teams in the same window
- Direction
- higher better
- Unit
- %
Percentile interpretation
Elite post-plant setups clear 75%.
Confidence = source confidence × model confidence. Values from baseline models are capped at 0.7. Below-minimum samples display the value grayed out with no percentile.
Example
Converts 19 of 26 plants → 73.1%.
Known limitations
- Not yet computed in the preview corpus — definition published ahead of engine support.
Change log
- v0.1.0 · 2026-07-16Initial baseline release