Site Take Success
STK%VALv0.1.0 · experimental · validated 2026-07-16What it measures
Attack rounds that reach a spike plant — the team's ability to take ground.
Formal definition
Attack rounds with a plant event ÷ attack rounds played.
Inputs
- spike plant events
- round sides
Exclusions
None beyond the standard confidence floor.
Sample & population
- Minimum sample
- 40 attack rounds
- Baseline population
- Teams in the same window
- Direction
- higher better
- Unit
- %
Percentile interpretation
High take rate with low post-plant conversion signals retake problems, not entry problems.
Confidence = source confidence × model confidence. Values from baseline models are capped at 0.7. Below-minimum samples display the value grayed out with no percentile.
Example
Plants in 26 of 44 attack rounds → 59.1%.
Known limitations
- Site-level splits need plant coordinates, which the current corpus lacks
- Not yet computed in the preview corpus — definition published ahead of engine support.
Change log
- v0.1.0 · 2026-07-16Initial baseline release